PMP?當(dāng)天每日一練試題地址:www.rydxd.com/exam/ExamDay.aspx?t1=33
往期PMP?每日一練試題匯總:www.rydxd.com/class/27/e33_1.html
PMP?每日一練試題(2023/1/11)在線測試:www.rydxd.com/exam/ExamDay.aspx?t1=33&day=2023/1/11
點擊查看:更多PMP?習(xí)題與指導(dǎo)
PMP?每日一練試題內(nèi)容(2023/1/11)
試題1
那些工具或技術(shù)可以用來控制風(fēng)險∶查看答案
試題參考答案:D
試題解析與討論:www.rydxd.com/st/4772011354.html
試題2
PMO負(fù)責(zé)制定組織的項目管理規(guī)章制度。查看答案
試題參考答案:A
試題解析與討論:www.rydxd.com/st/4605018884.html
試題3
項目團(tuán)隊剛剛完成個階段工作,團(tuán)隊開會討論本階段工作,目的是:查看答案
試題參考答案:D
試題解析與討論:www.rydxd.com/st/4232918027.html
試題4
在團(tuán)隊會議期間,三名項目相關(guān)方對項目管理計劃的意見不一致,其中一名相關(guān)方告訴其他相關(guān)方項目流程擁有授權(quán)序列,另外兩名相關(guān)方感到困惑,因為在他們參加的上一次會議中并未提到該信息,若要避免這個問題,項目經(jīng)理應(yīng)該事先做什么?查看答案
試題參考答案:B
試題解析與討論:www.rydxd.com/st/462747954.html
試題5
A project stakeholder complains about the quality of deliverables.The project manager believes that these deliverables meet the project's quality standards. What tool or technique should the project manager use to support this查看答案
試題參考答案:C
試題解析與討論:www.rydxd.com/st/4793629072.html
試題6
一個設(shè)計項目經(jīng)歷了兩個月后,客戶要求修改產(chǎn)品,項目經(jīng)理對此事并不知情。在最終測試階段,測試結(jié)果和計劃規(guī)定的不符。這是以下哪個問題造成的?查看答案
試題參考答案:A
試題解析與討論:www.rydxd.com/st/4818228679.html
試題7
在管理項目團(tuán)隊過程中,你的項目團(tuán)隊?wèi)?yīng)該是∶查看答案
試題參考答案:D
試題解析與討論:www.rydxd.com/st/47504635.html
試題8
敏捷團(tuán)隊即將開始第五個迭代周期。團(tuán)隊擔(dān)心,一個較舊工件的緊急維護(hù)任務(wù)花費太多。這已經(jīng)導(dǎo)致其很難遵守其他承諾。在回顧會議上,團(tuán)隊共同決定不將維護(hù)任務(wù)納入待辦列表,相反的,他們計劃降低產(chǎn)量,并增加下一個周期的浮動時間,下一個迭代周期將會發(fā)生什么?查看答案
試題參考答案:A
試題解析與討論:www.rydxd.com/st/5311626762.html
試題9
Stakeholders claims that a feature is missing from a deliverable. This feature was not查看答案
試題參考答案:C
試題解析與討論:www.rydxd.com/st/48374260.html
試題10
A project team member decides that engaging the customer on some alternative designs is unnecessary if all functionalities are delivered. The entire team decides to only engage the technical department on the best product design. After user acceptance testing the customer complains about the selected design. To ensure that the customer accepts the project deliverables, what should the project manager do?查看答案
試題參考答案:C
試題解析與討論:www.rydxd.com/st/4936619156.html
信管網(wǎng)訂閱號
信管網(wǎng)視頻號
信管網(wǎng)抖音號
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |